Kolbasenko says that adaptively the 115,000- square foot school was a key move for the CMCC. The school’s existing pool and gymnasium allowed the CMCC to have these facilities at a fraction of what it would have cost if they were new.
Kolbasenko says that adaptively the 115,000- square foot school was a key move for the CMCC. The school’s existing pool and gymnasium allowed the CMCC to have these facilities at a fraction of what it would have cost if they were new.